DAVIS Vantage Pro ISS Retrofit Kit Manual de instalación

Busca en linea o descarga Manual de instalación para Redes DAVIS Vantage Pro ISS Retrofit Kit. DAVIS Vantage Pro ISS Retrofit Kit Installation manual Manual de usuario

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 8
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 0
Product # 6920, 6920C
Vantage Pro
®
ISS Retrofit Kit
INSTRUCTIONS Estimated Time Required: 30 Minutes
This Instruction Sheet describes how to install the ISS Retrofit Kit for a Vantage
Pro
®
or Vantatge Pro Plus Integrated Sensor Suite (ISS).
Components
The ISS Retrofit Kit includes the following components and hardware:
New Sensor Interface Module (SIM) preinstalled in a SIM housing,
attached to a new bottom radiation shield plate along with a new sepa-
rate Temp/Hum sensor module
Three long screws with nuts, flat washers, and lock washers
One 3-volt CR-123A lithium battery
Tools for Setup
In addition to the kit, you will need the following tools:
7/16” (12mm) wrench or adjustable wrench
Phillips screw driver
Hammer
Pliers
Overview of Kit Installation
1. Remove the ISS from its Mounted Position
2. Dissassemble the ISS Radiation Shield
3. Install the Retrofit Kit components
4. Connect Cables and Power the New SIM
5. Verify Communications - Wireless Models
6. Mount the ISS
7. Return the Old SIM to Davis
ISS2 RetroKit D011.fm Page 1 Wednesday, February 19, 2003 6:02 PM
Vista de pagina 0
1 2 3 4 5 6 7 8

Indice de contenidos

Pagina 1 - ISS Retrofit Kit

Product # 6920, 6920CVantage Pro® ISS Retrofit KitINSTRUCTIONS Estimated Time Required: 30 MinutesThis Instruction Sheet describes how to install the

Pagina 2 - Opening the Radiation Shield

Page 2 Vantage Pro® ISS Retrofit KitRemove the ISS from its Mounted PositionIn order to take down your ISS you will first need to disconnect the anemo

Pagina 3

Dissassemble the ISS Radiation Shield Page 3Dissassemble the ISS Radiation ShieldNote:We recommend using a workbench or equivalent flat surface for th

Pagina 4

Page 4 Vantage Pro® ISS Retrofit Kit7. Hammer the three (3) long radiation shield screws down into the base. The screws should move fairly easily with

Pagina 5 - New SIM Connections

Install the Retrofit Kit Components Page 5Install the Retrofit Kit Components1. Open the SIM housing cover. Note the “S-loop” in which the TEMP-HUM c

Pagina 6 - TEMP-HUM

Page 6 Vantage Pro® ISS Retrofit Kit5. Place the top closed radiation shield plate that you saved during disassembly on top of the stack. The TEMP-HUM

Pagina 7 - Mount the ISS

Mount the ISS Page 73. Press the 2nd key then press and hold the CLEAR key until all transmission diagnostic counters are reset to zero.4. View the Pe

Pagina 8 - Troubleshooting

Product Numbers: 6920, 6920CDavis Instruments Part Number: 7395.307ISS Retrofit KitRev. B Manual (02/19/03)This product complies with the essential pr

Comentarios a estos manuales

Sin comentarios