Integrated Sensor Suite Installation ManualFor Vantage Pro2 & Vantage Pro2 Plus Weather Stations™™Davis Instruments, 3465 Diablo Avenue, Hay
Troubleshooting Cabled ISS Communication85. If the ISS contains a UV sensor and/or solar sensor, press 2ND and then press RAIN YR for current ultravio
9 Wireless ISS AssemblyThe ISS has a wireless connection to a Vantage Pro2 wireless console. Once the anemometer has been installed and the sensors ha
Verifying Data from the ISS Sensors10Verifying Data from the ISS SensorsUse these steps to verify reception of ISS data at the wireless Vantage Pro2 c
Troubleshooting Wireless ISS Reception11Note: If the LED is flashing rapidly, call Technical Support. See “Contacting Davis Instruments” on page 27 f
Troubleshooting Wireless ISS Reception12Transmitter ID DIP Switches in Top-right Corner of SIMTo change to another ID, use a ballpoint pen or paper cl
13Preparing the ISS for InstallationOnce all the sensors have been connected and communication between the ISS and the console has been successfully e
Prepare the Rain Collector142. Carefully cut and remove the plastic tie that holds the tipping bucket in place during shipping (usually yellow or whit
Locating the ISS and Anemometer154. Separate an end cap from one end of the magnet.Separate magnet from one end capInsert magnet with other end cap in
Locating the ISS and Anemometer16General ISS Siting Guidelines• Place the ISS away from sources of heat such as chimneys, heaters, air conditioners an
Locating the ISS and Anemometer17Optional: Anemometer Cable Length Considerations• All Vantage Pro2 stations include a 40' (12 m) cable to go bet
FCC Part 15 Class B Registration WarningThis equipment has been tested and found to comply with the limits for a Class B digital device, pursu-ant to
Locating the ISS and Anemometer18• If possible, align the pivot joints of both the ISS and the console antennas so that they are facing each other for
19Installing the ISSThe anemometer and the main part of the ISS can be installed either together as a single unit on a pole, or apart from each other.
Installing the ISS on a Flat Surface20Installation InstructionsThere are several ways to mount and install the ISS unit. The following are installatio
Installing the ISS on a Pole21Option 2: Installing the Anemometer on a Post or Flat Surface1. With a 3/16" (5 mm) drill bit, drill two holes appr
Installing the ISS on a Pole22Guidelines for Installing the ISS on a Pole• When mounting the ISS and anemometer together on opposite sides of the pole
Finishing the Installation23For the wireless ISS, swivel the ISS base so the solar panel is facing south (in the Northern Hemisphere), or north (in th
Additional Mounting Option24Extending the Console Cable (Cabled ISS Only)A cabled ISS can be extended up to 1000' (300 m) away from the console b
25Maintenance and TroubleshootingMaintaining UV and Solar Radiation SensorsIf the ISS is a Plus model and contains UV and solar radiation sensors, do
Troubleshooting26Note: For some models of the ISS, the order in which the five radiation shield plates are assembled may be slightly different than t
Troubleshooting27“The wind cups are spinning but my console displays 0 mph.”The signal from the wind cups may not be making it back to the display. Re
1IntroductionThe Integrated Sensor Suite (ISS) collects outside weather data and sends the data to a Vantage Pro2 console or Weather Envoy. Wireless a
28AppendixSpecificationsComplete specifications for the ISS and other products are available in the Weather Support section of our website at www.davi
SIM Board Display and Contents29SIM Board Display and ContentsSENSOR SENSOR INTERFACE INTERFACE MODULE MODULE UV UV SUN SUN RAIN RAIN WIND WIND TEMP T
Vantage Pro2 Integrated Sensor Suite Installation ManualDocument Part Number: 7395.249Rev G (January 27, 2010)For Vantage Pro2 Weather Stations #6322,
Preparing the ISS for Installation2Note: If the ISS is a Plus model and contains UV and solar sensors, do not touch the small white diffusers on top
Preparing the ISS for Installation3• Apply power to the ISS and test communication with the console.• Change the Transmitter ID for wireless communica
Check SIM Sensor Connections4Attaching the Wind Cups1. Push the wind cups up onto the anemometer’s stainless steel shaft.2. Slide the wind cups up the
Check SIM Sensor Connections5Open the SIM Box1. Locate the white box with the solar panel containing the SIM on the front of the ISS unit. The cabled
Check SIM Sensor Connections6Connect the Anemometer Cable to the SIM1. Unwind the coil of cable enough to work with the anemometer. Note: Do not unwi
7Cabled ISS AssemblyThe Cabled ISS system contains a cable for connecting the ISS to a Vantage Pro2 cabled console. Once the anemometer has been insta
Comentarios a estos manuales